• including tunnel & its associated items on the railway tracks.
    • Construction of switching posts, Traction Sub-station.
    • Modification to Signaling & telecommunication system to suit 25kV A.C. traction as per existing guideline.
    • Provision of service building and staff quarter along with associated civil engineering works.
    • All associated works including modification, dismantling of existing OHE including mast, bracket, gay rod & other equipments etc if any, as per site requirement shall be in the scope of EPC contractor.
    • The scope of work also includes provision of bridge masts on existing piers/ abutments by drilling/bolting/grouting or other suitable arrangements as per site conditions.
    • Insulators at Non-Interlocked Level Crossings: Wire & Rod insulators shall be provided on all non-inter locked level crossings under the supervision of Civil Engg. Deptt.

25 KV Sectioning post (SP) and sub-sectioning post (SSP) (Switching Post):

  • Design, supply, erection, testing and commissioning of single phase, 25 KV, 50 Hz, AC Switching Stations (SP/SSP) including Foundations, Structures and all ancillary equipment etc. as per following details along with Earth work, construction of buildings, fencing, retaining wall, Internal Wiring with switch/fittings/equipment’s, Battery Set, All types of caution, warning, instruction, protection, location/Name and schematic diagram boards, earthing stations, Safety items (i.e. Firefighting equipment, First Aid box, Shock treatment chart, key box etc.), manning till stabilization of SCADA (At least for a period of 06 months from commissioning) and all necessary documentation for EIG sanction and CRS Inspection, supply of required drawings, breakdown maintenance till CRS inspection.

25 KV Auxiliary transformer stations:

  • Design, supply, erection, testing and commissioning of single-phase Auxiliary Transformer Station of different capacity as per following details, complete with all structures and fittings etc. along with anti-climbing device and all types of caution, warning, instruction, protection boards and location/Name boards, junction box and all necessary documentation for EIG sanction and CRS Inspection and supply of required drawings, Breakdown attention till CRS inspection.

Traction Sub-stations (TSS):

  • Design, supply, erection, testing and commissioning of single phase, 220/132/25 KV, 50 Hz, AC Traction Sub Station (TSS), Feeding Post (FP), Shunt Capacitor Bank, series reactor, ABT meter along with all associated equipment including Foundations, Structures and all ancillary equipment, Earth mesh/electrode, buried rail and connections etc. as per following details along with Earth work, construction of buildings, approach road, Laying of Cross Track along with sleepers & fastenings, points & crossings, ballast main work, retaining wall, Fencing, internal wiring, yard lighting, arrangement for water supply, All types of caution, warning, instruction, protection, location/Name and schematic diagram boards, Safety items (i.e. Firefighting equipment, First Aid box, Shock treatment chart, key box etc.), manning till stabilization of SCADA (At least for a period of 06 months from commissioning) and all necessary documentation for EIG sanction and CRS Inspection, supply of required drawings, Breakdown attention till CRS inspection.

Website https://etenders.gov.in/eprocure/app may be referred for detailed terms and conditions of the bidding documents, which is available online.


Source: IRCON-Tender | Image Credit (representational): MoR

Comments

Popular posts from this blog

Exclusive रिपोर्ट | 2025 भारत-पाक युद्ध: क्या ट्रंप ने सच में युद्ध रुकवाया? सच्चाई चौंकाने वाली है

22 सितंबर से शुरू होगा चकिया की रामलीला, तैयारियां जोरों पर

उत्तर प्रदेश पंचायत चुनाव का बजा बिगुल, तैयारी की अधिसूचना जारी