including tunnel & its associated items on the railway tracks. Construction of switching posts, Traction Sub-station. Modification to Signaling & telecommunication system to suit 25kV A.C. traction as per existing guideline. Provision of service building and staff quarter along with associated civil engineering works. All associated works including modification, dismantling of existing OHE including mast, bracket, gay rod & other equipments etc if any, as per site requirement shall be in the scope of EPC contractor. The scope of work also includes provision of bridge masts on existing piers/ abutments by drilling/bolting/grouting or other suitable arrangements as per site conditions. Insulators at Non-Interlocked Level Crossings: Wire & Rod insulators shall be provided on all non-inter locked level crossings under the supervision of Civil Engg. Deptt. 25 KV Sectioning post (SP) and sub-sectioning post (SSP) (Switching Post): Design, supply, erection, testing and commiss...
Posts
Showing posts from September, 2023